After both the initial ground runup and the test flight, remove the oil sump plugs and screens and inspect for metal particles. Clean the screens before reinstalling them.
Check all lines for leakage and security of attachment. Especially, check the oil system hose clamps for security as evidenced by oil leakage at the hose connections. Also, inspect the cylinder holddown nuts or cap screws for security and safety. This check should also be performed after the flight immediately succeeding the test flight.
- Hoisting and Mounting the Engine for Installation
- Preparation of Engine for Ground and Flight Testing
- Propeller Check
- Rigging, Inspections, and Adjustments
- Turboprop Powerplant Removal and Installation
- Removal and Installation of an Opposed-Type Engine